97精品天天人人揉人人玩,AV在线播放WWW啦啦啦,亚洲va欧美va国产综合,人人曰人人做人人,成人黄色电影网址,欧美久久久久久中文字幕,欧美亚洲另类A片区,亚洲资源AV无码日韩AV无码

航空翻譯_飛行翻譯_民航翻譯_藍(lán)天飛行翻譯公司

承接南山公務(wù)機(jī)公司的達(dá)索獵鷹7X公務(wù)機(jī)全套飛行手冊(cè)翻譯任務(wù)

時(shí)間:2012-06-15 13:08來(lái)源:藍(lán)天飛行翻譯 作者:航空 點(diǎn)擊:

                     Height-pressure altitude conversion chart

              PITOT-STATIC SYSTEM CALIBRATION

                     ADS 1, 2, 3 and 4 - Ground run - All wheels on ground

                     ADS 1, 2, 3 and 4 - Gear up and gear down

                     ADS 1, 2, 3 and 4 - RAT deployed

              STALLING SPEEDS AND BUFFETING

                     Reference stall speeds

                     Buffet onset envelope

              ENGINE POWER SETTING - WITHOUT ICE PROTECTION

                     Take-off N1, Take-off run and first segment climb

                     Maximum continuous N1, One engine inoperative, Final take-off and en-route climbs

                     Maximum continuous N1, Two engines inoperative, Final take-off and en-route climbs

              ENGINE POWER SETTING - WITH ICE PROTECTION

                     Take-off N1, Take-off run and first segment climb

                     Maximum continuous N1, One engine inoperative, Final take-off and en-route climbs

                     Maximum continuous N1, Two engines inoperative, Final take-off and en-route climbs

              TAKE-OFF SF2

                     Example - Dry runway 

                     Balanced field length - Dry runway

                     Decision speed associated with balanced field length - Dry runway

                     Maximum brake energy speed (VMBE) - Dry runway

                     Example - Wet runway

                     Balanced field length - Wet runway

                     Decision speed associated with balanced field length - Wet runway

                     Maximum brake energy speed (VMBE) - Wet runway

航空翻譯 www.pankajksingh.com
本文鏈接地址:承接南山公務(wù)機(jī)公司的達(dá)索獵鷹7X公務(wù)機(jī)全套飛行手冊(cè)翻譯任務(wù)